Equinor and Partners Hand In Hywind Tampen Development Plans
Equinor and the Snorre and Gullfaks partners have submitted updated development plans to the Norwegian government for the Hywind Tampen floating wind farm.

The Hywind Tampen floating offshore wind farm will consist of 11 8MW wind turbines located some 140 kilometres from shore in 260-300 metres of water between the Snorre and Gullfaks oil and gas platforms.
Equinor and the partners reached a final investment decision for the project last week.
Scheduled to come online in late 2022, Hywind Tampen will be operated from Equinor’s Bergen office. Gulen Industrihamn in western Norway has been chosen for the assembly of the floating wind turbines.
The Snorre and Gulfaks oil and gas platforms will be the first-ever powered by a floating offshore wind farm.
The Gullfaks licence is held by Equinor Energy AS (51%), Petoro AS (30%), OMV (Norge), and AS (19%).
The Snorre licence is held by Equinor Energy AS (33.3%), Petoro AS (30%), ExxonMobil Exploration and Production Norway AS (17.5%), Idemitsu Petroleum Norge AS (9.6%), DEA Norge AS (8.6%), and Vår Energi AS (1.1 %).
List of related news articles
-
Posted: 8 days ago
VSL wins Hywind Tampen contract
VSL, a subsidiary of Bouygues Construction, will carry out post-tensioning works on the eleven float...
Posted: 8 days ago -
- video
Posted: about 1 month agoEquinor brings online Snorre expansion project
Norwegian energy giant Equinor started production from the Snorre Expansion Project in the North Sea...
Posted: about 1 month ago -
Posted: 3 months ago
Construction starts on world's largest floating wind farm
The construction has started on the world’s largest floating offshore wind farm, Hywind Tampen...
Posted: 3 months ago -
Posted: 8 days ago
Granada davit cranes for world’s largest floating offshore wind farm
Aker Solutions has awarded Granada Material Handling with a contract to supply eleven davit crane un...
Posted: 8 days ago