EWC Updates on Wasambo Drilling (Indonesia)

EWC Updates on Wasambo Drilling

Energy World Corporation announced that drilling programme for WASAMBO (Walanga – Sampi Sampi – Bonge) gas fields within the Sengkang PSC is progressing on schedule and on 18 October  the 300 feet gas column in Walanga #2 Well was reached at a depth of 2,322 feet.

The gas layer content and pressures are in line with expectations. Interpretations of these results are currently ongoing.

In the meantime, Tubing and Well Head Equipment is being installed on the Walanga #2 Well in preparation for commercial production.

The rig will then be removed to the Walanga #3 Well for the next well drilling operation.

[mappress]
LNG World News Staff, October 22, 2013; Image: EWC