ICSS Operated for AGBAMI FPSO

On November 17, the ICSS(Integrated Control Safety System) was put into operation for the AGBAMI FPSO, with the attendance of Mr. Milton T.Bruce, FPSO Manager, Mr.D.K.Lee, Executive Vice President of the Production Division, and around 30 representatives.
The ICSS is regarded as the core nerve network in that it is the system controlling all of the operations of the AGBAMI FPSO.
In recent developments related to the project, a total of 10 topside modules have been erected for the hull.