Kawasaki Heavy Opts for Yokogawa Control Systems

Yokogawa Electric Corporation has received an order from Kawasaki Heavy Industries, Ltd. to supply the control system for an LNG carrier that is being built for the Ichthys LNG project in Australia.

Kawasaki Heavy Opts for Yokogawa Control Systems

The ship will be the world’s largest Moss-type LNG carrier and will be used for transporting LNG from an onshore LNG processing plant that is being constructed as part of the Ichthys LNG project. The ship is scheduled to enter service by the end of 2016, in time for the completion of the plant. The ship is also the first Moss-type LNG carrier equipped with a dual fuel diesel engine (DFDE), which burns both fuel oil and gas.

Yokogawa will deliver the CENTUM® VP integrated production control system for monitoring and controlling the LNG carrier’s LNG tanks and loading/unloading facilities as well as the supply of gas to the DFDE and the supply of power to other driving units. Yokogawa will also be responsible for the engineering and commissioning of the control system.

 

[mappress]
yokogawa, February 17, 2014