Mubadala Spuds Two Wells Off Thailand

Mubadala Petroleum, Operator of the Manora Oil Development joint venture, has advised that the Atwood Orca jackup drilling unit has spudded the fourth and fifth of 15 planned development wells, MNA-04 and MNA-05. They have also advised that MNA-03 has been drilled to the final target depth.

Mubadala Spuds Two Wells (Thailand)
Atwood Orca

The MNA-04 and MNA-05 wells will be drilled to final target depths of 3,430m and 1,934m measured depth respectively and MNA-05 will be completed with electric submersible pumps (ESPs) ahead of handover to Production. MNA-04 is the first of the five planned water injector wells.

Mubadala Spuds Two Wells (Thailand)

The Manora A platform is located within the Gulf of Thailand in 46 metres of water. The development drilling program calls for drilling and completion of 15 wells (10 producers and 5 injectors), with the program expected to take until the end of Q1 2015. Production at Manora is now expected to start in the second half of October, rather than at the end of the third quarter 2014.

[mappress]

Press Release, October 03, 2014