2717 results found for 'monopiles'

2717 results found for 'monopiles'
Order results by

A list of search results

  • 29 September 2017

    The Mukran Port in Sassnitz on the island of Rügen has published a photo of the transition pieces for the 385MW Arkona offshore wind farm.

  • 10 May 2015

    VIDEO: Installation of 6MW Wind Turbine at Westermost Rough A2SEA’s specialist jack-up vessel Sea Challenger has recently installed the last 6MW turbine at Westermost Rough. Siemens Reorganizes Company. 4,500 People to Lose Jobs Siemens announced today that it is on track with the implementation of its concept for the company’s strategic realignment. Kentish Flats Extension […]

  • 30 January 2018
    Research & Development, Technology

    The Carbon Trust has announced the winners of the latest innovation competition in its Offshore Wind Accelerator (OWA) program which sought new or adaptable techniques for inspection of offshore wind foundations. Applications were open for four specific challenges, including weld inspection for monopile foundations, weld inspection for jacket foundations, grout inspection for monopile foundations and […]

  • 13 December 2013
    Business & Finance, Equipment

    After nine months of construction, the last of the 80 foundations for the DanTysk offshore wind farm has been installed. The monopile foundations, which are 65 metres long and weigh 950 tonnes, were driven into the seabed using a special hammer. Work was done in water depths of up to 32 metres, 70 km west […]

  • 1 September 2015

    The last load out of the Gode Wind 2+1 transition pieces and monopiles was completed yesterday at Bladt. The 97 transition pieces for the project were fabricated at Bladt’s facilities in Aalborg, Denmark, whereas the monopiles were fabricated by EEW SPC in Rostock, Germany. “The complete project has been a success. Timing is everything. Because of an […]

  • 4 April 2019

    Teesside-based EEW Offshore Structures Britain has rolled out the first of the 35 transition pieces (TPs) built for Ørsted’s Borssele 1 + 2 offshore wind farm in the Dutch North Sea. The first TP was photographed on its way to the blast shed, EEW OSB said. EEW SPC, the parent company of EEW OSB, is […]

  • 19 January 2012

    Mojo Maritime has won the Tidal Energy Engineering Firm 2011 award for the second year in a row, reports Maritime journal. Apart from this, the consortium, made up of Voith, Bauer, UoE & Mojo Maritime Ltd, has won the award for the Most Effective Tidal Energy Project 2011. The project was for the monopile foundation […]

  • 13 December 2013
    Business & Finance

    After nine months of construction, the last of the 80 foundations for the DanTysk offshore wind farm has been installed. The up to 65 metres long and up to 950 tonnes heavy, cylindrical steel foundations – monopiles – were anchored in the seabed using a special hammer. Work was done in water depths of up […]

  • 19 May 2014

    Last month, Seajacks completed the installation work at the Meerwind project, a German offshore wind farm. Seajacks Zaratan worked alongside Seajacks Leviathan, self-propelled jack-ups, on the project, where they installed 80 wind turbines, including monopiles, transition pieces, towers and nacelles. Seajacks also managed the scour protection installation around the monopiles. The rock material, which was loaded […]

  • 19 May 2014

    Last month, Seajacks completed the installation work at the Meerwind project, a German offshore wind farm. Seajacks Zaratan worked alongside Seajacks Leviathan, self-propelled jack-ups, on the project, where they installed 80 wind turbines, including monopiles, transition pieces, towers and nacelles. Seajacks also managed the scour protection installation around the monopiles. The rock material, which was loaded […]

  • 25 March 2016

    The 27th monopile and its corresponding transition piece were installed at Nordsee One on 7 March, according to the consultancy company Con4Mare. This means that GeoSea, which is in charge of the installation of all monopiles and transition pieces at the wind farm’s site, has finished 50% of the work. The work is being carried out from the […]

  • 26 June 2017
    Business & Finance

    Rambiz, Scaldis’ heavy lift vessel, installed recently the unmanned gas platform L13-FI for NAM in the North Sea. The 85-meter-long ship has two cranes, shallow draft and large deckspace. The combination of two main cranes enables Rambiz to lift unusual structures that would otherwise require two separate vessels. The lifting, upending, positioning and driving of the […]

  • 14 June 2021
    Business Developments & Projects, Innovation, Project & Tenders

    A truly pioneering offshore wind project, the first to be built without government subsidies, has reached a major milestone with the start of offshore construction work. The offshore work started earlier this month with the installation of the scour protection at the first of the 140 monopile foundation locations at the 1.5 GW Hollandse Kust […]

  • 10 July 2013
    Storage

    All four export cables have been installed at RWE npower renewables’ flagship Gwynt y Môr Offshore Wind Farm off the North Wales coast. The final subsea cable burial was completed between the coast and one of the two offshore substations on Tuesday 2 July. In addition, half of the foundations are finished with a monopile […]

  • 10 July 2013
    Storage

    All four export cables have been installed at RWE npower renewables’ flagship Gwynt y Môr Offshore Wind Farm off the North Wales coast. The final subsea cable burial was completed between the coast and one of the two offshore substations on Tuesday 2 July. In addition, half of the foundations are finished with a monopile […]

  • 30 January 2018
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    The Carbon Trust has announced the winners of its latest innovation competition to find new methods to inspect offshore wind substructures. The competition, launched as part of the Carbon Trust’s Offshore Wind Accelerator programme, targeted companies with new or adaptable techniques for inspection of offshore wind foundations. Entries were sought to address four specific challenges: […]

  • 5 August 2020
    Business Developments & Projects

    Per Aarsleff A/S has produced 89 out of the 165 concrete working platforms (CWPs) for Ørsted’s 1.4 GW Hornsea Project Two offshore wind farm. The CWPs are being built at Per Aarsleff’s concrete precast factory in Poland, Aarsleff BIZ, for Bladt Industries and EEW OSB, which are producing 135 and 30 transition pieces for the […]

  • 7 November 2013

    In September, the first turbine was installed at the West of Duddon Sands offshore wind farm in the East Irish Sea, approximately 14 km from the nearest coast on Walney Island, Cumbria. A total of 108 wind turbines will be installed by the Sea Installer and Pacific Orca, with the wind farm expected to be […]

  • 4 June 2015

    First Subsea has hired Gary Howland to drive Renewables Connectors Business. Prior to joining Jee, Mr Howland was Vice President – Renewables at Trelleborg Offshore developing business in the global renewable energy sector, in particular offshore wind. Drawing on his recent experience in subsea cable engineering consultancy Gary Howland, commented, ”Cable installation is an area where there […]

  • 23 November 2017
    Ports & Logistics, Research & Development

    Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

  • 27 May 2021
    Business Developments & Projects, Project & Tenders, Vessels

    A major construction milestone has been reached at what is to be the largest operating offshore wind farm once commissioned. AIS data and social media posts are indicating that vessels are gathering to start the turbine installation phase at the wind farm. Located some 89 kilometres north-east of Grimsby, the UK, the 1,386 MW Hornsea […]

  • 21 October 2014
    Environment

    AdBm Technologies released a report on its recent offshore demonstration at the Butendiek offshore wind farm. A demonstration of the AdBm Technologies underwater noise abatement system was conducted on 11–12 July, 2014 in partnership with WPD and Ballast Nedam. During pile driving operations for monopiles BU 32 and BU 21, a peak reduction of almost […]

  • 12 April 2018
    Ports & Logistics

    Offshore wind installation vessel Pacific Osprey is loading the first monopiles and transition pieces for the 497MW EnBW Hohe See offshore wind farm at the Port of Vlissingen in the Netherlands.

  • 12 April 2018
    Ports & Logistics

    Offshore wind installation vessel Pacific Osprey is loading the first monopiles and transition pieces for the 497MW EnBW Hohe See offshore wind farm at the Port of Vlissingen in the Netherlands.

  • 13 January 2020

    STS Belgium is carrying out the cabling of the transition pieces for the Triton Knoll offshore wind project. STS is conducting the work at Smulders’ yard in Hoboken and at the Sif Maasvlakte terminal in Rotterdam, the Netherlands. To remind, Seaway 7’s installation vessel Seaway Strashnov arrived at the Triton Knoll offshore wind project site […]