Stabilis Energy opens George West LNG production facility

Stabilis Energy informed it has opened its LNG production facility in George West, Texas.

The 100,000 LNG gallon per day facility is strategically located in the heart of the Eagle Ford Shale to provide fuel for high horsepower engines used in the oilfield, as well as transportation, mining, rail, marine, asphalt and other industrial sectors, the company said in a statement.

The Stabilis George West facility is a dedicated LNG production facility that is open for business 24 hours per day and 365 days per year. The facility features two truck loading racks that can load two transport trailers simultaneously in less than an hour. The facility has approximately 270,000 gallons of storage capacity.

[mappress mapid=”16870″]

Image: Stabilis Energy