VBMS Installs Umbilical for Wintershall Noordzee

VBMS has successfully completed a remote platform tie-back project – platform L8-P4 to L6-B – for Wintershall Noordzee B.V.

The scope of work for VBMS consisted of the engineering, installation and burial of a 19.5 kilometre umbilical, at a water depth of 29 meters.

The J-tube pull-ins were performed directly from the cable-laying vessel Ndurance via its quadrant system without any interruption or temporary lay-down of the umbilical. VBMS deployed a specialised burial vessel for the post-installation jet trenching. A follow-up as-laid survey of the umbilical route verified that the burial exceeded the requirements in order to ensure optimal protection of the umbilical.

L6-B platform

The L6-B platform is a remote tie-back to L8-P4 in the L blocks in the Dutch sector of the North Sea, located approximately 30 kilometers northwest of Den Helder. The platform is the newest addition to the Wintershall offshore assets in this sector.

VBMS CEO, Arno van Poppel, commented: “As VBMS, we expanded our services with Oil & Gas SURF to allow more comprehensive and cost-effective solutions for our clients. Through thorough engineering and efficient offshore operations we enabled Wintershall to facilitate the safe and efficient installation of the control umbilical in a timely manner.

Press Release
[mappress mapid=”10884″]