EnQuest Hires Technip for Alma and Galia Development (UK)

Business & Finance

EnQuest Hires Technip for Alma and Galia Development (UK)

France-based international oilfield services provider Technip has been awarded by EnQuest Britain Limited a contract for the development of the Alma and Galia fields in UK North Sea.

The fields are situated approximately 310 kilometers Southeast of Aberdeen, United Kingdom.

The Alma and Galia fields which will be tied back to the EnQuest Producer floating production storage and offloading unit (FPSO), are located at a water depth of approximately 80 meters.

The contract covers:  installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline, installation of three 8” flexible risers, installation of two production control umbilicals risers, installation of four power cables and associated dynamic risers, procurement, fabrication and installation of a 175 ton manifold structure, associated trenching operations, tie-ins, testing and commissioning.

Technip’s operating center in Aberdeen will execute the contract. Vessels from the Technip fleet will be used for the campaign including the Skandi Arctic and the Orelia, as well as third-party vessels.

In November 2011 EnQuest sanctioned the development of Alma and Galia fields.

[mappress]
Offshore Energy Today Staff, June 25, 2012