Daewoo: The 128th Batch Launching for Bergesen LPG and MSC

On the 8th of July, two vessels were launched from No.2 dock.
The first vessel was H.N.2309, a 38K CBM LPGC for Bergesen LPG, and the second one launched during the 128th batch launching was an 8,400 TEU Containership for MSC bearing our H.N. 4110.
The percentage of production progress for the H.N.2309 was 91.3%, and that of H.N.4110 was 91.4%.