1079 results found for 'browse flng'

1079 results found for 'browse flng'
Order results by

A list of search results

  • 24 April 2012

    Karoon Gas Australia said that at 08:00 hours (WST) today, the Boreas-1 exploration well was ready to make up the 12-1/4” bottom-hole drilling assembly prior to running in the hole to drill ahead. Since the last report a 36” hole was drilled, the conductor was run and cemented at 572 m, a 17-1/2” hole was drilled, […]

  • 15 August 2013
    Business & Finance

    Sulzer Pumps will supply 69 pumps to Daewoo Shipbuilding and Marine Engineering for installation on a new Floating Production Storage and Offloading (FPSO) vessel for the INPEX-operated Ichthys LNG Project in the Browse Basin offshore Western Australia, scheduled for delivery in several phases between mid-2013 and mid-2014. Sulzer Pumps South Korea will undertake the full […]

  • 12 December 2012

      Karoon Gas Australia announced that at 06:00 hours (WST) today, mechanical repair of the Blowout Preventers (BOP) was being undertaken. Upon completion of the repairs, the BOP and marine riser will be re-run to the sea floor to allow drilling of the 12-1/4” hole section to proceed. Since the last report, the BOP’s and […]

  • 12 June 2015

    InterOil, the company developing the Elk-Antelope LNG project in Papua New Guinea, informed it has appointed Saxon Palmer as Senior Vice President, Exploration.

  • 30 August 2016

    Eagle LNG Partners submitted the draft Resource Report 13 for the Jacksonville LNG project to the Federal Energy Regulatory Commission (FERC) as part of the pre-filing process.

  • 11 February 2014

    Santos GLNG’s Upstream Operations workforce has moved into a new permanent accommodation camp 40 kilometres off the Warrego Highway near Roma. Personnel that work at the Roma gas compression hub are staying at the 80-person camp, which was built by Walton Construction. Santos Vice President Queensland Trevor Brown said the business was delivering on a […]

  • 28 June 2013

    Lloyd’s Register (LR) has signed the classification contract for six 174,000 m3 liquefied natural gas (LNG) tankers to be built by Hudong Zhonghua Shipbuilding (Group) Co. Ltd. The project is a key milestone in Chinese shipbuilding and a key indicator in the development of China’s LNG ambitions. When delivered, the ships will load LNG in […]

  • 1 November 2022
    Business Developments & Projects, Collaboration, Outlook & Strategy, Transition

    Australian energy company Woodside and the Japan Bank for International Cooperation (JBIC) have signed a memorandum of understanding (MoU) aimed at securing a stable supply of energy for Japan and assisting in achieving decarbonisation goals. This deal, which was described as the ‘historic non-binding MoU’, was signed on 1 November 2022. It aims to promote cooperation […]

  • 7 January 2020

    The Australian Environmental Protection Authority (EPA) has recommended approval for the state component of a liquid natural gas (LNG) pipeline, part of the Scarborough gas field project.

  • 16 February 2017

    An impairment charge of A$1.9 billion deepened Australia’s Origin Energy’s losses to A$1.68 billion (Approx: US$1.3 billion) for the half-year 2017, down from A$254 million in the corresponding period a year before.

  • 24 June 2014
    Equipment, Project & Tenders

    The INPEX-operated Ichthys LNG Project has welcomed the semi-submersible pipelay barge SEMAC-1 to the Northern Territory, Australia. The arrival of the 188 metre-long Saipem-operated vessel at the Darwin Outer Port Limits signals the start of important work on the Project’s 889 kilometre gas export pipeline (GEP) which will connect Bladin Point to the Ichthys Field […]

  • 15 June 2015

    Dominion informed that the request filed to the U.S. Court of Appeals for the District of Columbia by environmental groups asking for a halt of the construction of the Dominion Cove Point LNG facility has been denied.

  • 28 June 2013
    Business & Finance

    Lloyd’s Register (LR) has signed the classification contract for six 174,000 m3 liquefied natural gas (LNG) tankers to be built by Hudong Zhonghua Shipbuilding (Group) Co. Ltd. The project is a key milestone in Chinese shipbuilding and a key indicator in the development of China’s LNG ambitions. When delivered, the ships will load LNG in […]

  • 7 April 2017

    Australian offshore vessel provider MMA Offshore has named its second platform supply vessel destined to support the giant Ichthys gas development offshore W. Australia. The vessel, christened MMA Brewster, will  provide long-term production support operations to Inpex –  the Ichthys field operator. MMA Offshore won the contract back in 2014, and had to build two […]

  • 16 January 2013

    Karoon Gas Australia announced that the Zephyros-1 well was preparing to drill ahead at 2918m after re-manning following the suspension of operations and rig evacuation caused by tropical cyclone Narelle. Since the last report, the 12-1/4” inch hole was drilled from the 13-3/8” casing seat at 2691m to the current depth of 2918m, the hole […]

  • 5 November 2014
    Equipment, Operations & Maintenance

    The INPEX-operated Ichthys LNG Project has begun integration of the lower turret with the Project’s floating production, storage and offloading (FPSO) facility. Having travelled from Singapore, the unique 4,200 tonne, 31 metre-tall turret structure was safely inserted into the hull of the FPSO, which is currently under construction at Daewoo Shipbuilding and Marine Engineering (DSME) […]

  • 28 June 2017
    Business & Finance, Operations & Maintenance

    Sapura Energy Berhad (SEB)’s wholly-owned Australian subsidiary, Sapura Energy Australia has completed the Shell Prelude light well intervention (LWI) campaign – plug removal activity for in the Browse Basin, north of Broome, Western Australia. The campaign, completed on June 16 2017, was part of the Shell Prelude FLNG project. Awarded in June 2016, the campaign […]

  • 4 August 2011

    Kentz Corporation Limited, the holding company of the Kentz engineering and construction group, announced the appointment of Christian Brown as Group Chief Operating Officer and Eddie Lewis as Group Development Officer. Chris joined Kentz this month and has responsibility for Kentz’s global operations and functional services, as well as joining the Management Executive Committee. Chris […]

  • 20 January 2013

    Cuadrilla has announced it plans to submit a planning application to Lancashire County Council to hydraulically fracture and flow test the well site near Banks. Cuadrilla is exploring for natural gas in Lancashire. Having already drilled a vertical well at the site near Banks they are now planning to submit an application to advance the […]

  • 7 June 2013

    Santos announced a gas discovery at the Bassett West-1 exploration well in WA-408-P, located in the Browse Basin offshore Western Australia. Bassett West-1 is located approximately 475 kilometres north-northeast of Broome and approximately 90km east-northeast of the Crown-1 discovery, made in the adjacent WA-274P permit by Santos in November last year. The water depth at […]

  • 15 August 2013
    Business & Finance, Equipment

    Sulzer Pumps will supply 69 pumps to Daewoo Shipbuilding and Marine Engineering for installation on a new Floating Production Storage and Offloading (FPSO) vessel for the INPEX-operated Ichthys LNG Project in the Browse Basin offshore Western Australia, scheduled for delivery in several phases between mid-2013 and mid-2014. Sulzer Pumps South Korea will undertake the full […]

  • 20 September 2012

    Karoon announced that wireline logs were being acquired in the Boreas-1 well. Since the last report, 108 metres of core was cut and recovered to surface, and the well was drilled to its total depth. Wireline logging will include pressure testing and sampling programs in order to confirm the LWD and mudlog indications of hydrocarbons […]

  • 28 June 2013
    Project & Tenders, Vessels

    Lloyd’s Register (LR) has signed the classification contract for six 174,000 m3 liquefied natural gas (LNG) tankers to be built by Hudong Zhonghua Shipbuilding (Group) Co. Ltd. The project is a key milestone in Chinese shipbuilding and a key indicator in the development of China’s LNG ambitions. When delivered, the ships will load LNG in […]

  • 23 March 2012
    Business & Finance

    NYK-HINODE LINE, LTD. has been awarded the ocean carriage for module contract by JKC Joint Venture (JKC J/V) formed by JGC Corporation, KBR Overseas Inc., and Chiyoda Corporation for INPEX led Ichthys LNG (Liquefied Natural Gas) Project. The Ichthys LNG Project is a joint venture between INPEX (76%, the operator) and Total (24%). Gas from […]

  • 14 January 2017
    Business & Finance, Equipment, Technology, Vessels

    DEME’s 7.950m³ LNG-powered trailing suction hopper dredger, named the Scheldt River, was launched today at Royal IHC’s shipyard in Krimpen aan den IJssel. This impressive ship is the second dredging vessel in the world that is equipped with dual fuel engines and capable of operating in full LNG mode. The 3.500m³ TSHD Minerva, launched on […]