788 results found for 'undersea cables'

788 results found for 'undersea cables'
Order results by

A list of search results

  • 4 August 2010
    Storage

    RWE Innogy and ABB have today signed a contract for delivery of underwater cable for the offshore wind farm “Nordsee Ost”. In total, ABB will supply around 63 kilometres of sea cable. They will be used to network the 48 wind turbines of the wind farm with one another and connect them to an offshore transformer station. The undersea cable will be produced by an ABB subsidiary in Sweden. The contract is valued at around EUR 10 million.

  • 17 May 2016
    Equipment

    The U.S. Defense Advanced Research Projects Agency (DARPA) has selected BAE Systems to develop an undersea navigation system aimed at enhancing the U.S. Navy’s ability to provide precise, global positioning throughout the ocean basins. The contract will support a program called the Positioning System for Deep Ocean Navigation (POSYDON), which seeks to allow undersea vehicles […]

  • 3 December 2014
    Authorities & Government, Storage

    Works associated with the laying of the undersea electricity cable between the UK and Norway have been approved by the MMO. The Norwegian government gave consent for the development in its waters in October 2014 with the Secretary of State for Climate Change, Ed Davey, commenting on its significance. The high-voltage direct current (HVDC) cable […]

  • 6 August 2012
    Storage

    Pharos Offshore Group has completed cable repair and burial for the London Array Offshore Wind Farm on a section of damaged subsea export cable. Pharos delivered a work package with the rapid mobilisation of engineering, fabrication and operational teams to locate, recover, re-lay and re-bury the power cable off the Kent coast. The 800mm² HVDC […]

  • 6 August 2012
    Business & Finance, Operations & Maintenance, Project & Tenders

    Pharos Offshore Group has completed cable repair and burial for the London Array Offshore Wind Farm on a section of damaged subsea export cable. Pharos delivered a work package with the rapid mobilisation of engineering, fabrication and operational teams to locate, recover, re-lay and re-bury the power cable off the Kent coast. The 800mm² HVDC […]

  • 25 January 2017
    Business & Finance, Equipment, Operations & Maintenance

    The Southeast Asia- US (SEA-US) cable system said it has closed in on completion of the installation of its undersea fiber optic cable network by the second quarter of 2017. Namely, the Hermosa Beach, California shore-end was successfully connected. In addition, on January 12, 2017, the U.S. Federal Communications Commission (FCC) granted the SEA-US cable landing […]

  • 11 September 2013
    Business & Finance, Operations & Maintenance, Project & Tenders

    TE SubCom, a TE Connectivity Ltd. Company and an industry pioneer in undersea communications technology, and SubPartners Pty Ltd (SubPartners) announce the signing of a system supply contract for the APX-West submarine cable system from Perth, Australia to Singapore. APX-West will deliver low-latency, diverse capacity between Australia and Singapore. APX-West is a four fibre-pair system […]

  • 24 January 2013
    Business & Finance, Operations & Maintenance, Project & Tenders

    Emerald Networks, a new-build network submarine cable system that will connect North America to Europe and Iceland with extraordinary new capacity, announced the signing of a Landing Party Agreement (LPA) with multinational telecommunications provider AT&T. Under this agreement AT&T will provide facilities and operational support for terminating the Emerald Express subsea cable at the former […]

  • 9 September 2015
    Business & Finance, Equipment, Operations & Maintenance

    Xtera Communications has completed the loading of its second repeatered submarine cable system that will be deployed within the next 2 months in the Atlantic Ocean. This new repeatered project will go live after the successful upgrade of the High capacity, Undersea Guernsey Optical-fiber (HUGO) subsea cable system connecting Porthcurno (UK), Guernsey (UK) and Lannion (France), […]

  • 11 June 2015
    Storage

    Intertek has helped to support National Grid and Statnett in the development of an infrastructure project linking the UK and Norwegian electricity networks (NSN Link) which, when constructed, will be the world’s longest high voltage direct current (HVDC) undersea interconnector. For the past four years, Intertek has acted as marine consultants for the two companies […]

  • 14 January 2015
    Research & Development, Storage

    A collaboration between the Offshore Renewable Energy (ORE) Catapult and GnoSys Global Ltd is supporting the development of a new insulation material for power cables to improve their performance in the onshore and offshore renewable energy industries and drive down whole life network costs. New, more reliable electrical connections are needed to meet the growing […]

  • 14 January 2015
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    A collaboration between the Offshore Renewable Energy (ORE) Catapult and GnoSys Global Ltd is supporting the development of a new insulation material for power cables to improve their performance in the onshore and offshore renewable energy industries and drive down whole life network costs. New, more reliable electrical connections are needed to meet the growing […]

  • 19 May 2017
    Business & Finance, Equipment, Operations & Maintenance

    Huawei Marine and Super Sea Cable Networks (SEAX) said that offshore and inshore marine surveys covering the full route of its SEAX-1 submarine cable system between the Eastern seaboard of Peninsular Malaysia, Singapore and Indonesia have been completed. Huawei Marine has started manufacturing of the submarine cable and the SEAX-1 cable system is said to be well on […]

  • 17 October 2014
    Business & Finance, Project & Tenders

    TenneT TSO B.V. and Energinet.dk, the Dutch and Danish Transmission System Operators (TSOs), are developing an undersea HVDC (High-Voltage Direct Current) interconnector that will directly connect the Dutch and Danish electricity grids to each other. TSOs have issued a contract notice regarding the scope for a submarine and underground cable system consisting of design, engineering, […]

  • 14 January 2015
    Research & Development, Storage

    A collaboration between the Offshore Renewable Energy (ORE) Catapult and GnoSys Global Ltd is supporting the development of a new insulation material for power cables to improve their performance in the onshore and offshore renewable energy industries and drive down whole life network costs. New, more reliable electrical connections are needed to meet the growing […]

  • 8 May 2019
    Business & Finance, Equipment, Operations & Maintenance

    PCCW Global and Telecom Egypt recently signed a landing party agreement in Beijing. This agreement will enable the Pakistan & East Africa Connecting Europe (PEACE) cable system to land and cross Egypt, effectively linking Asia, Africa and Europe with a 12,000km ultra-low latency high-speed cable system. The trilateral agreement between Telecom Egypt, PCCW Global and […]

  • 25 June 2015
    Equipment

    Xtera Communications announced the deployment of its repeater into the High capacity, Undersea Guernsey Optical-fiber (HUGO) subsea cable system connecting Porthcurno (UK), Guernsey (UK) and Lannion (France). This project represents the first deployment of Xtera’s repeater in a commercial system, as well as the first deployment of a Raman-based submarine repeater, the company said. The […]

  • 14 March 2015
    Storage, Technology

    ABB has signed a deal for 201MW  Xiangshui offshore wind farm located 10 kilometers off the coast of Xiangshui County. Namely, the Swiss company will supply full range of power equipment for  project’s 220 kV offshore substation which delivers wind power to onshore transformer stations. It includes 220 kV power transformers, medium-high voltage SF6 gas insulated switchgears, and […]

  • 14 March 2015
    Storage, Technology

    ABB has signed a deal for 201MW  Xiangshui offshore wind farm located 10 kilometers off the coast of Xiangshui County. Namely, the Swiss company will supply full range of power equipment for  project’s 220 kV offshore substation which delivers wind power to onshore transformer stations. It includes 220 kV power transformers, medium-high voltage SF6 gas insulated switchgears, and […]

  • 26 September 2017
    Operations & Maintenance

    Hawaiki Submarine Cable and TE SubCom informed that the final preparations are underway for the start of the installation of the Hawaiki submarine cable in early October 2017. According to the latest update, the 14,000 km of undersea fiber-optic cable that comprise the Hawaiki transpacific cable system are in the final stages of being loaded […]

  • 20 January 2023
    Authorities & Government, Regulation & Policy

    The first of two subsea protection ships dedicated to safeguarding UK’s oil and gas pipelines, as well as seabed telecommunications cables, has arrived in Merseyside.

  • 21 March 2017
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Energinet.dk has awarded a framework agreement to JD-Contractor for the contingency repair of its subsea cables. The agreement covers all Energinet.dk subsea asserts in Denmark, among others the transmission systems and the export cables for all Danish offshore wind farms. The contract started in September 2016 for a fixed period of five years with the possibility of […]

  • 3 December 2014
    Equipment, Operations & Maintenance

    Works associated with the laying of the undersea electricity cable between the UK and Norway have been approved by the Marine Management Organisation (MMO). The Norwegian government gave consent for the development of the longest subsea electricity interconnector in the world, in its waters in October 2014 with the Secretary of State for Climate Change, […]

  • 19 March 2019
    Business & Finance, Human Capital

    NKT’s Board of Directors has appointed ABB’s Alexander Kara as the new Chief Executive Officer (CEO) and President. The new executive will join the Danish company on 1 August, when he will take the place of Roland M. Andersen, who is interim CEO. At ABB, Kara is currently holding the position of Senior Vice President, HUB Business […]

  • 21 September 2011
    Business & Finance, Operations & Maintenance, Research & Development

      International Underwater Storage Ltd publishes a Paper for an Undersea Surveillance Barrier, based on its CHECKMATE undersea platform, suitable for screening a port facility. The proposal provides for a triple barrier with detection modules at 5, 13 and 24 kms offshore from the focal point. The table gives the warning time at each barrier […]