USA: Technip Wins Mad Dog Spar Design Job

USA Technip Wins Mad Dog Spar Design Job

French based Technip has been awarded a front end engineering design (FEED) contract by BP Exploration & Production Inc. This contract covers the design of a Spar  hull and mooring systems for the Mad Dog Phase 2 Project, located near Green Canyon Block 825 in the Gulf of Mexico.

Spar is a cylindrical, partially submerged offshore drilling and production platform that is particularly well-adapted to deepwater. The first award comes under the framework of the 10-year Spar platform master services agreement signed in 2011.

The Mad Dog Phase 2 Spar will be located near the first Mad Dog Spar delivered by Technip for BP in 2004, and installed on Green Canyon 782. Detailed engineering for the new Spar is scheduled to start during the second half of 2012.

Technip’s operating center in Houston, Texas, will execute the contract with support from the center in Pori, Finland.

[mappress]
Offshore Energy Today Staff, April 30, 2012