New BWTS Model from ERMA FIRST

ERMA FIRST makes the next step in ballast water treatment systems introducing ERMA FIRST BWTS FIT for the first time, at Posidonia Exhibition 2014.

New BWTS Model from ERMA FIRST

The new model from ERMA FIRST serves the bigger ballast pump capacities without disclosing it though from smaller flow rates where the installation of ERMA FIRST BWTS is not feasible.

ERMA FIRST BWTS FIT is based on whole flow electrolysis from the lately developed electrolytic cells which are already used on the existing model.

The new cells are able to operate in low salinity and low temperature waters which broads it operation limits. The major change of the model is the replacement of the double separation stage, pre- filter and innovative hydrocyclones with a 40 microns mesh automatic back flushing basket filter.

ERMA FIRST BWTS FIT operates for all pump capacities, for all available spaces, it’s flexible, it’s simple, it fits for purpose. The approval of the system is expected in the fourth quarter of 2014.

 

[mappress]

June 3, 2014