Riverbed dredger arrives on Tyne

A 300ft (90m) dredger has arrived on the Tyne as work on the river’s second traffic tunnel reaches a crucial milestone. The Vesalius will dredge a channel into the riverbed between East Howdon and Jarrow, into which prefabricated tunnel sections will be dropped into place.