5487 results found for 'Goliat'

5487 results found for 'Goliat'
Order results by

A list of search results

  • 5 February 2015
    Business & Finance, Equipment, Operations & Maintenance

    Eni Norge has reported that the Goliat platform has been towed on board the Dockwise Vanguard at the HHI yard in South Korea. The largest cylindrical FPSO (Flotating production, storage and offloading) facility ever built, and specially designed for the Arctic conditions of the Barents Sea by Sevan Marine, was loaded onto the world’s largest marine transport […]

  • 27 June 2016

    An offshore worker has been injured on Eni Norge’s Goliat floating production storage and offloading (FPSO) unit in the Barents Sea.  According to Stavanger Aftenblad, a Norwegian news website, there was an accident on board the Goliat FPSO on Saturday after which one offshore worker was sent to hospital in Tromsø, Norway. The Norwegian news website also reported […]

  • 3 February 2011

    Aker Solutions has secured more of the workscope for the offshore construction phase for the Barents Sea Goliat project. Under a new deal the Norwegian contract group has been selected to install a subsea power cable from the field location back to shore.

  • 19 February 2015

    Eni has published a video that captures its Goliat FPSO being towed on board Dockwise Vanguard transport vessel and its subsequent sail-away from South Korea to Norway.  The Floating and Production Storage Offloading Unit (FPSO) Goliat was designed by the Norwegian company Sevan Marine in Arendal and built at the HHI yard in South Korea. On […]

  • 30 November 2015
    Business & Finance, Equipment

    ABB, a Swiss-based power and automation technology group, has commissioned a subsea power link for Eni Norge’s field in the Barents Sea. The power link will supply power from the Norwegian grid to the new Goliat Floating, Production, Storage and Offloading unit (FPSO). According to the company, the 105.5-kilometer subsea power cable system is the longest […]

  • 17 September 2009

    Aker Solutions has signed a contract with Eni Norge AS to deliver a subsea production system to the operator’s Goliat field development in the Barents Sea. Contract value is approximately NOK 2.3 billion. Scope of work comprises engineering, procurement and construction (EPC) of a complete subsea production system. Subsea hardware deliveries include eight overtrawlable four-slot […]

  • 13 February 2015

    Hyundai Heavy Industries (HHI) announced that Goliat FPSO, the world’s largest cylindrical FPSO ordered by Eni Norge, sailed away from its yard.  The 64,000 ton cylindrical floater, measuring 112 m in diameter and 75 m in height, is designed to store one million barrels of crude oil per day. The FPSO will be installed in […]

  • 16 May 2014
    Business & Finance, Equipment

    Eni Norge has announced that the Goliat FPSO will depart the Hyundai yard in South Korea in early 2015, a decision taken at a licence meeting on Friday 16 May. The licence determined that conditions to depart at the end of June 2014, and complete commissioning in Norway in Q4 2014, were not in place. […]

  • 19 September 2012
    Business & Finance

    Apply Sørco has been awarded the operations and maintenance support contract for the Goliat field in the Barents Sea by Eni Norge. The contract includes pre-operations support services as well as technical services and support during the field operations phase. The first phase of the work includes provision of technical services for supporting the preparations […]

  • 23 December 2015
    Project & Tenders

    Italian oil giant Eni is set to delay first oil from its Goliat development in the Barents Sea once again. The field, dubbed the world’s northernmost offshore development, was originally planned for first oil in 2013. In August this year, Eni Norge said the start of production was just „a few weeks“ away. It is now […]

  • 8 May 2015

    Eni Norge AS has received consent from the Petroleum Safety Authority (PSA) Norway to use the Floatel Superior, an accommodation and construction support vessel, as a flotel for the Goliat field in the Barents Sea.  Floatel Superior was built at the Keppel FELS shipyard in Singapore and completed in March 2010. The vessel is operated by Floatel […]

  • 5 February 2015
    Equipment

    Eni Norge has informed that Stril Barents, a supply and standby vessel, is ready to start operations at the Goliat field in the Barents Sea. Eni says that the vessel will strengthen oil spill and search and rescue contingency operations at the field location. According to the company, Goliat will enter into production this summer […]

  • 13 April 2018
    Infrastructure

    A fire broke out on board Eni-operated Goliat FPSO early on Friday, forcing the Italian oil company to halt production from the Barents Sea field. 

  • 16 May 2011

      Hamworthy has won a major contract from Hyundai Heavy Industries (HHI) to supply a complete inert gas generator system, as part of the shipbuilder’s latest Floating Production Storage and Offloading (FPSO) newbuild contract. The contract calls for delivery of a fully assembled inert gas system (IGS) to the Goliat FPSO, to be located in […]

  • 12 January 2017

    Norway’s Petroleum Safety Authority has identified multiple breaches in regulations aboard the Eni-operated Goliat platform in the Barents Sea.   The PSA Norway on Thursday released reports tackling different issues identified aboard the giant cylindrical FPSO and has ordered Eni to reassess the ways it manages the operations there. The Goliat has been plagued by […]

  • 9 January 2018

    Eni will use the Songa Enabler rig for drilling and completion of two infill wells at the Goliat field, offshore Norway. The Petroleum Safety Authority on Thursday gave its consent to the Italian oil company to use the rig on the Barents Sea wells 7122/7-C-2 H and 7122/10-E-4 H, respectively. Owned by Songa Offshore, the […]

  • 11 December 2017
    Infrastructure

    Italian oil company Eni has received permission from Norwegian authorities to restart production from its Goliat field located in the Barents Sea offshore Norway. 

  • 4 June 2013

    Eni Norge relies on Intergraph® SmartPlant® Enterprise solutions for owner operators for one of the most challenging projects in the Barents Sea, a marginal sea of the Arctic Ocean, located north of Norway and Russia. Goliat is the first oil field to be developed in the Barents Sea, and therefore sets the industry standard as […]

  • 27 May 2016
    Business & Finance

    Eni Norge, a Norwegian subsidiary of Eni, an Italian oil giant, has appointed Philip Hemmens to lead the company, following the recent start of production from the Goliat field in the Barents Sea, off Norway. Eni Norge said in a statement on Friday that Philip Hemmens became the Managing Director of the company. Hemmens takes charge […]

  • 20 January 2016
    Business & Finance, Operations & Maintenance

    Eni Norge has received the Petroleum Safety Authority Norway’s consent to use Goliat FPSO and associated facilities on the Goliat field. Goliat is around 50 kilometres south-east of the Snøhvit field. Water depth in the area is 360-420 metres. The field has been developed using a circular FPSO (Sevan 1000), and eight subsea templates with a […]

  • 18 June 2015
    Project & Tenders

    Eni Norge has reported that final preparation of the Goliat platform, the circular floating, production, storage and offloading (FPSO) vessel, is well under way in the Barents Sea. With more than 600 people now working offshore at the Goliat field, activity levels are high in order to prepare for production start-up later in the summer, Eni […]

  • 30 June 2017
    Business & Finance, Operations & Maintenance

    Eni Norge AS has received consent from the Petroleum Safety Authority Norway to perform manned underwater operations in connection with repairs and improvements at Goliat field. Goliat is an oil field in the Barents Sea, around 50 kilometres south-east of Snøhvit. The field has been developed using a floating production unit (FPSO). The planned start-up […]

  • 13 May 2015
    Operations & Maintenance

    Eni Norge AS has received consent for manned underwater operations connected with the Goliat facility. Eni Norge AS (Eni) is the operator of the Goliat field, which is located on the Tromsøflaket bank around 85 km north-west of Hammerfest. The field is being developed using a floating production, storage and offloading (FPSO) vessel of the […]

  • 16 May 2014
    Business & Finance

    The Goliat FPSO will depart Hyundai Heavy Industries yard in South Korea in early 2015, a decision taken at a licence meeting on Friday 16 May. The licence determined that conditions to depart at the end of June 2014, and complete commissioning in Norway in Q4 2014, were not in place. In particular, elements necessary […]

  • 14 March 2016
    Project & Tenders

    After years of delays, Eni, an Italian oil company, has started production from the Goliat field in the Barents Sea. The field, dubbed the world’s northernmost offshore development, was originally planned for first oil in 2013. Goliat, located 85 kilometers northwest of Hammerfest, offshore northern Norway, is the first oil field to come on stream […]