367 results found for 'byron'

367 results found for 'byron'
Order results by

A list of search results

  • 28 January 2020
    Exploration & Production, Project & Tenders

    The Enterprise Offshore Drilling 264 (EOD 264) drilling rig has arrived on location to drill the SM71 F4 well from Byron Energy’s SM71 F platform located in the U.S. Gulf of Mexico.

  • 26 June 2014
    Project & Tenders

    Byron Energy Limited advises that yesterday at 11.50 am the Byron Energy SM 6 #1 BP01 well in the U.S. Gulf of Mexico was drilling ahead at 7,952 feet (2,424 metres) measured depth and 7,883 feet (2,403 metres) true vertical depth when an 1,800 unit gas show resulted in 250 psi on the surface choke. Currently, the drill […]

  • 10 June 2014
    Business & Finance, Project & Tenders

    Byron Energy Limited advises that as at 6 am (USA Central Time) on Monday, 9 June, 2014 the Byron Energy SM 6 #1 well has reached a measured depth of 6,813 feet (2,077 metres) with true vertical depth at 6,793 feet (2,070 metres). Current operations at SM 6 #1 well int he U.S. Gulf of […]

  • 15 January 2019

    Byron Energy has produced more than 1 million barrels of oil from its operated South Marsh Island Block 71 F platform located in the U.S. Gulf of Mexico.

  • 7 August 2019
    Exploration & Production

    Australia-based Byron Energy has started drilling at the Cutthroat prospect located on its operated SM58 lease in the U.S. Gulf of Mexico. 

  • 20 February 2020
    Exploration & Production

    After refusing to participate in Byron Energy’s SM71 F4 well in the Gulf of Mexico, Otto Energy decided that it would be participating in the drilling of the next well, named SM71 F5.

  • 11 September 2020
    Infrastructure, Operations & Maintenance, Project & Tenders

    Louisiana-based contractor Morrison has installed oil and gas sales pipelines for Byron Energy’s South Marsh Island Blocks 58 & 59. The project marked more than 1676 kilometres of pipe laid by Morrison in the Gulf of Mexico. The most recent 18.5-kilometre pipeline installation campaign consisted of 3 inch, 4 inch, 6 inch and 8 inch […]

  • 5 February 2018
    Exploration & Production

    Byron Energy has started completion operations on Gulf of Mexico wells ahead of production start in March.

  • 9 April 2018

    Byron Energy has brought online its third well at the South Marsh Island Block 71 (SM 71) oil project lcoated in the U.S. Gulf of Mexico. 

  • 18 December 2017
    Project & Tenders

    Byron Energy expects to reach total depth (TD) at the SM 71 F2 well in the U.S. Gulf of Mexico by the end of this month. 

  • 22 February 2018
    Exploration & Production, Project & Tenders

    Byron Energy has completed the F1 well in the SM 71 lease in the Gulf of Mexico. The well is now ready for production.

  • 12 June 2014
    Business & Finance

    Byron Energy Limited advises that as at 6 pm (USA Central Time) on Wednesday,11 June, 2014 the Byron Energy SM 6 #1 well in the U.S. Gulf of Mexico, has reached a measured depth of 7,738 feet (2,358 metres) with true vertical depth at 7,646 feet (2,330 metres). Whilst at this depth and making a connection, the […]

  • 4 April 2016

    Byron Energy has started drilling the SM 71 #1 well, located in South Marsh Island Block 71, in the U.S. Gulf of Mexico. The company is using the Hercules 205 jack-up drilling rig for the operation. The rig spudded the well April 3 2016, and the well is now drilling ahead at 671 feet measured depth. […]

  • 10 January 2018
    Project & Tenders

    Byron Energy has started drilling the SM 71 F3 development well in the South Marsh Island 71 (‘SM 71’) lease in the U.S. Gulf Of Mexico.

  • 22 November 2017
    Exploration & Production, Project & Tenders

    Byron Energy has installed the the SM 71 Platform in the U.S. Gulf of Mexico, offshore Louisiana. This has been reported by Otto Energy, Byron’s partner in the South Marsh Island 71 (SM 71) oil and gas development. Otto Energy on Wednesday confirmed that installation of the jacket and decks comprising the SM 71 F […]

  • 26 March 2018

    Production has started from Byron Energy’s South Marsh Island Block 71 (“SM 71”) oil development, in the shallow water of the U.S. Gulf of Mexico, Otto Energy has informed.

  • 20 April 2016
    Exploration & Production, Project & Tenders

    Byron Energy has completed the drilling of the SM- 71 #1 well in the U.S. Gulf of Mexico intersecting hydrocarbon saturated sands in three intervals.  This includes the primary D5 target, with a combined gross thickness of 150 feet/46 metres. The company started drilling the well, located at the South Marsh Island Block 71, earlier in April. According to […]

  • 12 June 2018

    Byron Energy has been awarded four blocks by BOEM at the Gulf of Mexico OCS Lease Sale 250.

  • 11 February 2016
    Exploration & Production, Project & Tenders

    Byron Energy, the operator of several blocks in the Gulf of Mexico, has mobilised Hercules Offshore’s drilling rig Hercules 205 to the SM-6 #2 well location in the U.S. Gulf of Mexico.  The rig was recently released by its previous operator, Renaissance, and it will operate for Byron under a dayrate between $49,000 and $51,000. According to Otto Energy, […]

  • 20 May 2014

    Byron Energy Limited has announced that the contracted jack-up drilling rig, Spartan Rig 202, arrived on the Byron Energy SM6 #1 well location in the South Marsh Island Block 6 (“SMI 6”) on Saturday morning, 17 May 2014 (USA Central Time), and is currently jacking-up.

  • 21 August 2012
    Business & Finance

    LGO today announces the sale of its minority interests in two offshore exploration leases in the US Gulf of Mexico. Leni Gas and Oil US Inc, a subsidiary of LGO, has agreed to sell its interests in two exploration leases; South Marsh Island-6 and Ship Shoal-180 (the “Leases”), in which it holds a 20% interest. […]

  • 19 September 2018
    Project & Tenders

    Byron Energy will recomplete the F2 well on its Gulf of Mexico South Marsh Island Block 71 (SM 71) project in the last week of September.

  • 13 May 2014
    Business & Finance

    Byron Energy Limited advises that mobilisation of the contracted jack-up drilling rig, Spartan Rig 202, to the Byron Energy SM6 #1 well location (“SM6 #1”) in the South Marsh Island Block 6 (“SMI 6”) in the U.S. Gulf of Mexico has been delayed due to high sea conditions which have prevented the rig from safely leaving […]

  • 4 December 2017
    Exploration & Production, Project & Tenders

    Byron Energy has started drilling an offshore well at its South Marsh Island 71 block, in the Gulf of Mexico, offshore Louisiana. According to Byron’s partners Otto Energy, Byron spudded the SM 71 F2 well on Sunday evening, using the Ensco 68 jack-up rig. The rig is located over the platform to allow the F1 […]

  • 1 July 2014
    Project & Tenders

    On June 27, 2014 Byron Energy Limited advised that at 4.00 pm on June 26 2014 ,USA Central time, the Byron Energy SM6 #1 BP01 well was reestablishing complete circulation in preparation to trip out of the hole and resume operations. Circulation was re-established at a depth of 7,424 feet (2,263 metres) measured depth, 7,377 […]