PSA Conducts Ivar Aasen Load-Bearing Audit

From 23 to 25 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Det norske’s follow-up of the Ivar Aasen project.

Det-norske-Announces-Good-Start-of-2014

The objective was to verify that engineering of the load-bearing structures was in compliance with applicable regulations.

Result
No non-conformities were identified.

Improvement points were identified in connection with:
– Redundancy controls;
–  Documentation;
– Non-conformity handling;
– Fatigue classification of jacket elements.

Press Release, June 27, 2014