VIDEO: ‘Ceona Amazon’ Construction Continues

After being successfully floated at Crist Yard in Poland back in April, the Ceona Amazon was towed to Lloyd Werft Bremerhaven for extensive outfitting.

ceona

The 199-metre versatile deepwater field development vessel with her huge product carrying capacity (5,000t of flexible or 8,500t of rigid pipe) stored on and below her 4,600m² deck, twin 400t AHC Masthead cranes working in tandem lifting mode, her innovative on-vessel pipeline fabrication (welding, NDT and FJC) and superior operability (drill ship hull), is a breakthrough in offshore pipelay, heavy construction and floaters installation services.


View on Youtube.

Once completed in Germany she will move to Huisman yard in Schiedam (The Netherlands) for installation of a 570t pipelay tower and two 400t cranes before entering into operation early 2015.

Press Release, August 13, 2014